G2 Structural                        "The Strong and Simple Solution"

Commercial Engineered Wood - Nationwide                                      

Design - Engineering - Sales - Manufacturing

For General Information Call: Adrianna Holden 206-402-7685 adrianna@g2structuralaz.com 

 

G2T Commercial Open Web Truss - Project Portfolio 


Empire Nissan - Ontario, CA

Architect: Whitfield Associates, Inc.

Engineer: Grimm & Chen Structural Engineers

G.C:  Kunzik and Sara Construction, Inc.

Span:  72'

O.C. Spacing:  48"

Specified in:  Design/Build

Supplied in:   Tapered G2T-46M

Under Budget and On Time


Mountain Grove at Citrus Plaza - Redlands, CA

Architect: Bickel Group

Engineer: HSA & Associates

Framer:  Pabon Construction

Span:  70'

O.C. Spacing:  32"

Specified in:  46" Red-H™

Supplied in:   46" G2T-44

Under Budget and On Time


TMP Wokano - Tustin, CA

Architect:   Robinson Hill

Engineer:   FWC

Framer:     SG Framing

Span: 29'

O.C. Spacing:  48"

Specified in:  26" Red-L™                      

Supplied in:  26" G2T-42

Under Budget and On Time


Pacific District Industrial - Vernon, CA

Architect:   RGA Associates

Engineer:   BTI

Framer:     LGC Builders

Span: 26' (Mezzanine)

O.C. Spacing:  16"

Specified in:  22" Red-L™

Supplied in:  22" G2T-42

Under Budget and On Time


Union Mercantile - Orcutt, CA

Architect:   RA & Associates

Engineer:   Hawkins Structural Engineers

Framer:     Strength Framing

Span:  26' (Office Floor)

O.C. Spacing:  16"

Specified in:  18" Red-W™

Supplied in:  18" G2T-42

Under Budget and On Time


Riverside Plaza Pad 2 - Riverside, CA

Architect:   Architects Orange

Engineer:   Petra Structural Engineers

Framer:     Herron Construction

Span:  52' (Roof)

O.C. Spacing:  32"

Specified in:  Tapered 47" to 34 1/8" OWT

Supplied in:  Tapered 47" to 34 1/8"  G2T-44

Under Budget and On Time


Newport Place Pad-A, Newport Beach, CA

Architect:   Stoutenborough

Engineer:   Tilden Engineering

Framer:     Advanced Framing Systems

Span:  32' (Roof)

O.C. Spacing:  96"

Specified in:  32" G2T-44P

Supplied in: 32" G2T-44P

Under Budget and On Time


West Casitas, Los Angeles, CA

Architect:   Troedsson Design & Planning 

Engineer:   ANM Engineering

Framing Contractor:  Renn Construction

Pro Dealer:  Ganahl Lumber Company

Span:  22' (Roof)

O.C. Spacing:  24"

Specified in:  20.25" Red-L™

Supplied in: 20.25" G2T-44L

Under Budget and On Time


Di Stefano Cheese, Pomona, CA

Architect:   Michael Douglass Design Associates

Engineer:   Engineering Design, LLC

General Contractor:  Zeus Construction

Framing Contractor:  Amort Construction

Span:  34' (Roof)

O.C. Spacing:  24"

Specified in:  20"-34" Tapered Red-S™

Supplied in: 20"-34" G2T-44L

Under Budget and On Time


Cal Trans, San Luis Obispo, CA


Architect:   Arris Studio Architects

Engineer:   Ashley Vance

General Contractor:  Specialty Construction Inc.

Framing Contractor:  BJH Construction

Span:  32' (Floor)

O.C. Spacing:  24"

Specified in:  Red-S™

Supplied in: 27" G2T-44L


Under Budget and On Time